Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 国产精品无码a精品影院 | 天天澡天天添天天摸97影院 | 日韩欧美中文字慕在线麻豆精品 | 一级片黄色电影 | 国产精品一级做a爰片性色毛片国产一级a毛 | 四虎成人精品在永久在线 | 人人操人人摸人人干 | 91香蕉国产线观看免费茄子 | 伊伊人成亚洲 | 国产成人av无码一区二 | 国产精品免费一区二区久久 | 人妻少妇偷人精品久久久 | 91精品夜夜夜一区二区 | 日本韩国欧美综合一区二区 | 国产在线拍揄自揄视频不卡99 | 99久久精品国产免费 | 欧美一区二区三区四区黑人 | 嫩草视频影院 | 国产av成人无码精品久久久 | 日韩一区二区无码一区 | 国产高潮流白浆aa免费看 | 成在人线av无 | 国产亚洲av片在线观看 | 亚洲成a人片在线观看中文!!! | 欧美日韩在大午夜爽爽影院 | 国产成人无 | 99国产在线视频 | 97国产精品视频免费观看 | 国产成人国拍亚洲精品 | 欧美尤物在线一区二区 | 午夜亚洲国产理论 | 午夜视频在 | 不卡日韩av无码国产精品 | 精品无码中文视频在 | 97久久草草超级碰碰碰 | 精品一区二区三区无码免费直 | 国产一级按摩不 | 亚洲v?中文字幕无码毛片 | 日韩欧美亚洲综合久久 | 国产精品亚洲av三区 | 日韩人妻无码精品久 |