91男人影院-91嫩艹嫩艹-91你懂得-91农村精品一区二区在线-91农熟女-91女神

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 亚洲区视频在线观看 | 97精品一区二区视频在线观看 | 强奷乱码中文字幕熟无 | 国产福利精品在线观看 | 日韩电影免费观看2025 | 91蜜桃传媒精品久久久一 | 极品人妻的娇喘呻吟 | 夜里十大禁用app在线观看 | 国产精品成人无码a片免费网址 | 国产91在线播放九色000 | 欧洲女人牲交视频免费 | 成人精品在线观看 | 91免费观看国产人妖 | 91手游网 | 麻花传剧原创mv | 国产在线观看免费 | 偷拍自怕亚洲91 | 国产日韩成人香蕉软件下载 | 91影视免费版官方最新版下载 | 日韩美女爱爱视频一区 | 一区二区三区免费在线观看 | 亚洲级αv | 办公室扒开奶罩揉吮奶头免费a片 | 亚洲中文字幕无码专区 | 色综合久久综合久鬼88 | 国产乱子伦精品免费看 | 午夜播放器app2025最新版下载安装 | 欧美午夜特黄aaaaaa片 | 99r精品视频只有精品高清6 | 尹人香蕉久久99天天拍 | 亚洲精品操逼视频免費資訊 | 亚洲国产精品无码一区二区 | 国产超碰人人爽人人做人人添 | 国产白丝精品91爽爽久 | 免费人成黄页网站大全在线观看 | 国产精品三级在线看免费看 | 国产午夜理论不卡在线观看 | 国产精品影院一级片在线免费看 | 欧美一级影院在线观看 | 国产日韩欧美精 | 亚洲精品国产精品制服丝袜 |