RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://www.cncnr.cn/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 亚洲免费福利在线视频 | 亚洲精品无人一区二区 | 欧美精品在线免费观看 | 亚洲成a人片在线观看日本 亚洲成a人片在线观看日本+在线播放 | 91免费视频观看 | 国产一区二区丝袜在线播放 | 国产成人av三级在线观看 | 在线免费观欧美 | 亚洲日韩精品无码专区加勒比 | 无码人妻久久一区二区三区蜜 | 国产精品第一页在线观看 | 91视频app免费下载app最新版 | 夜晚10大禁用b站免费 | 国产日韩精品中文字幕视频一区福利不卡三级 | 白丝爆浆18禁一 | 日韩成人短视频在线看网站 | 熟妇女人妻丰满少妇中文字幕 | 免费高清国产 | 天狼影院| 2025久久国产综合精品swag | 国产精品美女 | 欧美成aⅴ人高清免费 | 91久久大香伊蕉在人线 | 国产suv精品一区二区五 | 亚洲最新精品电影 | 欧美日韩亚 | 欧美日韩视频一区二区 | 国产免费人成视频尤勿视频 | 亚洲国产精品福利片在线观看 | 国产乱码精品一区三上 | 亚洲av无码国产精品色午夜 | 91精品国产综合久久 | 日本不卡一区高清二区三区中文字幕 | 国产乱子影视频上线免费观看 | 欧美人妻| 亚洲精品| 成人亚洲性情网站www在线观看 | 伊人色播激情五月丁香 | 欧美三级欧美成人高清 | 国产精品精品国产免费电影 | 国产激情久|